This site uses cookies. By continuing to browse the site, you agree to our use of cookies. Find out more about cookies.
Skip to main content
The Climate Action Accelerator
  • English Choose language Choisir la langue Elegir el idioma
    • Français
    • Castellano
Sign In
  • Home
  • Help

MSF - OCB's Global Environmental Footprint Initiative

Building MSF OCB environmental roadmap

Phase 2 of 3
PHASE 2.1 : STATE OF AFFAIRS 14/06/2022 - 15/07/2022
Process phases
  • The process
  • THE PROCESS
  • Phase 2.1 : State of affairs
  • Phase 2.2 : Proposals
  • How-to?
chevron-left Back to list

Responsibility over our own construction waste disposal by handling it directly or ensuring construction companies subcontracted handle it properly

Avatar: Uriel aboim Uriel aboim
01/07/2022 08:20  
Withdrawn
1- Consider reduce, reuse and recycle during design and construction. 2- Categorize the different types of waste and their respective environmental impact. 3- Know each possible way to safely and legally deal with each type. 4- Map official dump sites, landfilling, recycle plants, or any other available method. 5- Include clauses for waste management in the construction contracts and monitor if this is being respected.6- Include construction waste management in the mission’s SOPs and OCB BASICs.
  • Filter results for category: 07. BUILDINGS AND ENERGY 07. BUILDINGS AND ENERGY

List of Endorsements

Avatar: Uriel aboim Uriel aboim
Reference: caa-PROP-2022-07-886
Version number 2 (of 2) see other versions
Check fingerprint

Fingerprint

The piece of text below is a shortened, hashed representation of this content. It's useful to ensure the content hasn't been tampered with, as a single modification would result in a totally different value.

Value: 4dd1dd6007c47f78aa780739081aea4a9d1bb4b023bfdb7c7c4bcb6d54ae4ef7

Source: {"body":{"en":"1- Consider reduce, reuse and recycle during design and construction. 2- Categorize the different types of waste and their respective environmental impact. 3- Know each possible way to safely and legally deal with each type. 4- Map official dump sites, landfilling, recycle plants, or any other available method. 5- Include clauses for waste management in the construction contracts and monitor if this is being respected.6- Include construction waste management in the mission’s SOPs and OCB BASICs."},"title":{"en":"Responsibility over our own construction waste disposal by handling it directly or ensuring construction companies subcontracted handle it properly"}}

This fingerprint is calculated using a SHA256 hashing algorithm. In order to replicate it yourself, you can use an MD5 calculator online and copy-paste the source data.

Share:

link-intact Share link

Share link:

Please paste this code in your page:

<script src="https://participation.climateactionaccelerator.org/processes/OCB/f/94/proposals/886/embed.js?locale=en"></script>
<noscript><iframe src="https://participation.climateactionaccelerator.org/processes/OCB/f/94/proposals/886/embed.html?locale=en" frameborder="0" scrolling="vertical"></iframe></noscript>

Report inappropriate content

Is this content inappropriate?

Reason

0 comments

Order by:
  • Older
    • Best rated
    • Recent
    • Older
    • Most discussed

Add your comment

Sign in with your account or sign up to add your comment.

Loading comments ...

  • Frequently Asked Questions (FAQ)
  • Rules Book
  • Legal terms
  • Download Open Data files
Decidim Logo
Creative Commons License
Website made by Open Source Politics with the decidim free software.

Confirm

OK Cancel

Please sign in

Forgot your password